TECHNICAL ASSISTANCE AND SUPERVISION FOR BULANCAK WATER AND WASTEWATER PROJECT

TECHNICAL ASSISTANCE AND SUPERVISION FOR BULANCAK WATER AND WASTEWATER PROJECT
TECHNICAL ASSISTANCE AND SUPERVISION FOR BULANCAK WATER AND WASTEWATER PROJECT
TECHNICAL ASSISTANCE AND SUPERVISION FOR BULANCAK WATER AND WASTEWATER PROJECT

Beneficiaries: Bulancak Municipality

Project Start Date: 06/2013

Duration: 72 Months

Project Objectives and Results:

The overall objective of the project is to accelerate Turkey’s accession to EU by enabling Turkey to achieve a high level of environmental protection & compliance with EU wastewater sector directives. The Project provides technical assistance to Bulancak Municipality and the Project Implementation Unit (PIU) via administrative, financial & technical capacity building in operating an efficient Water Utility Department.

The results achieved are as follows:

Result 1: Institutional development of the Water Utility Department (WUD) of the municipality

Result 2: Capacity improvement to enable the implementation of planned projects

Result 3: Contract management & construction supervision for water supply system (Works Contract-1)

Result 4: Preparation of design report, drawings and full tender dossier for the implementation of the wastewater treatment plant based FIDIC Yellow Book

Result 5: Contract management and construction supervision for wastewater treatment plant and rehabilitation of wastewater collectors (Works Contract-2)

Result 6: Preparation of tender dossier including a market survey for the provision of equipment and provision of technical assistance in tendering, contracting, successful delivery and use of the equipment

Provided construction supervision services for:

Works Contract – 1: Construction of Drinking Water Supply System (FIDIC Red Book)

  • Drilling/construction of 4 new wells and rehabilitation of 3 existing wells
  • Installation of chlorination equipment for disinfection of water
  • Replacement of 4.800 house connections with polyethylene type house connections
  • Replacement of 97 km of old network pipes with HDPE pipes
  • Installation of bulk flow-meters & level sensors for automation & monitoring system (SCADA)
  • Construction of 4 new pumping stations, rehabilitation of 1 existing pumping station
  • Renovation of 4 water storage tanks & construction of 6 new reservoirs (100 m³ – 3000 m³)
  • Replacement of 27 km of transmission line with Ductile Iron pipes

Works Contract – 2: Construction of Bulancak Wastewater Treatment Plant and Rehabilitation of Sewerage Network System (FIDIC Yellow Book)

  • Construction of 1st stage (2025) Wastewater Treatment Plant (activated sludge with carbon, nitrogen & phosphorus removal) serving 50.000 p.e. with 12.045 m³/day design flow rate
  • Construction of 1.4 km HDPE PN6 rising main and 4 km sewer collectors (DN500 – DN800)
  • Construction of 6 km sewer network (DN200 – DN300)
  • Construction of 333 manholes and 224 house connections
  • Rehabilitation of 1 pumping station
  • Construction of 2 new pumping stations

Target Groups:

  • Bulancak Municipality
  • Inhabitants of Bulancak

Reference Number: EuropeAid/130667/D/SER/TR