X
GO
08 June 2020

Technical Assistance and Supervision for Bandırma Integrated Water Project

Beneficiary: Balıkesir Water and Sewerage Administration General Directorate (BWSD)
Project Start Date: 06/2020
Duration: 55 Months 
Status:  Ongoing

The overall objective of the project is to accelerate Turkey's accession to the EU by enabling Turkey to achieve a high level of environmental protection and compliance with the EU water and wastewater sector directives.

23 January 2020

Technical Assistance and Supervision for Giresun Wastewater Project

Beneficiary: Department of European Union and Foreign Relations within the Ministry of Environment and Urbanisation
Project Start Date: 12/2021
Duration: 55 Months 
Status: Ongoing

The overall objective of the project is to accelerate Turkey’s accession to the EU by enabling Turkey to achieve a high level of environmental protection and compliance with the EU wastewater sector directives.

01 June 2017
The Establishment of National Environmental Label in Turkey

The Establishment of National Environmental Label in Turkey

Beneficiary: Republic of Turkey Ministry of Environment and Urbanisation
Project Start Date: 06/2017
Duration: 7 Months 
Status: Completed

The overall objective of the Project is,Improving the environmental conditions in Turkey by implementation and enforcement of the EU Environmental Acquis (Regulation (EC) No 66/2010 of the European Parliament and of the Council of 25 November 2009 on the EU Ecolabel) in the framework of the National Environmental Labelling System and supportig Turkey for establishement of the National Environmental Labelling System and ensuring the Institutional Capacity Building.

01 October 2015
Republic of Turkey National Transport Master Plan Republic of Turkey National Transport Master Plan Republic of Turkey National Transport Master Plan

Republic of Turkey National Transport Master Plan Republic of Turkey National Transport Master Plan Republic of Turkey National Transport Master Plan

Beneficiary: Ministry of Transport Maritime and Communication
Project Start Date : 10/2015
Duration : 25 Months
Status: Completed

The  purpose of the project is to prepare National Transportation Master Plan which will facilitate development of a sustainable, safe, secure, accessible, inclusive, fast and technologically innovative transport sector and transport infrastructure that will support competitive logistics and increase the welfare of the Turkish citizens and competitiveness of Turkish economy.

01 August 2015
Technical Assistance and Supervision for Kahramanmaras Water and Wastewater Project

Technical Assistance and Supervision for Kahramanmaras Water and Wastewater Project

Beneficiary: Kahramanmaraş Water and Sewerage Administration
Project Start Date : 08/2015
Duration : 50 Months
Status: Completed

The purpose of the project is to to provide Technical Assistance to Kahramanmaraş Metropolitan Municipality and the Project Implementation Unit (PIU) through administrative and technical capacity building.

123